CASE STUDY:

PENNSYLVANIA DEP GRANTS PERMISSION FOR OPERATOR TO P&A WELL AFTER EXPANSION SERVICE 

CONDITION:

This Pennsylvania well was scheduled for plug and abandonment, however, gas flow in the annulus prevented the operator from starting the process. All gas migration and pressure had to be eliminated before the Pennsylvania Department of Environment Protection (DEP) would let P&A operations commence. Previous attempts at stopping the gas flow with traditional squeeze cement jobs proved unsuccessful. 

PROBLEM IDENTIFICATION:

The operator contacted Renegade Services. After reviewing well problems, Renegade recommended its Local Expander technology, which expands the casing into the cement and blocks the path of any unwanted gas flow.  

 

SOLUTION & RESULTS:

Utilizing Local Expander technology, Renegade created two sets of three expansions. The first set of expansions was performed at depths of 3369, 3370 and 3371 ft while the second set was at 2069, 2070 and 2071 ft, successfully sealing the annulus. The gas rate dropped from 1.5 mscf/day to zero flow after five days while the pressure rate decreased from 105 psi to zero psi after 14 days. Upon reviewing these successful results, the Pennsylvania DEP granted permission for the operator to P&A the well. 

» Decrease in both pressure and gas rate to zero show the effectiveness of Local Expander technology and allowed the operator to P&A the well.

Local Expander – Annular Squeeze Tool™ 

Let's start the conversation about how Renegade and the Local Expander can work for you. 

M
RENTALS

Technical: (337) 371-7635
Sales: (325) 267-1693
Office: (337) 321-4145

SERVICE

Sales: (318) 272-8320
Office: (337) 321-4145

M

FORM SUBMISSION: Lead from Template Page at renegadewls.com

15 + 6 =

FORM SUBMISSION: Lead from Local Expander Page at renegadewls.com

1 + 9 =

M